Go back

Go back

Projects (selection)

  • Reference network analysis and cost driver analysis of electric utilities (2022 – 2023). Looking ahead to the energy transition, what are potentially suitable comparison parameters for an efficiency comparison? Client: Regulatory Authority.  
  • Token economics for an NFT launchpad and trading platform (2022). How to allocate and distribute the native token of the NFT lauchpad and trading platfrom Meme Cake? Client: Meme Cake.  
  • Determination of Xgen in Germany (2022 – ). Have German gas and electricity networks become more productive? At what level should the Xgen be set for the fourth regulatory period? Client: Bundesnetzagentur (BNetzA).